Z Series E85 Z4 3.0i (N52) ROADST
Necessary preliminary tasks:
•
Drawing off, evacuating and filling the A/C system are not
included in the time value given for this work operation
•
Remove A/C compressor drive belt
•
Remove front underbody protection
•
If necessary, remove coolant thermostat
Release screws (1) and remove refrigerant lines.
Installation:
Replace all sealing rings and moisten with refrigerant oil.
Tightening torque 64 52 1AZ
.
Release screws (2).
Carefully press coolant thermostat (3) to one side.
Tightening torque 11 53 1AZ
.
Disconnect plug connection (1).
Release screw (1).
Installation:
Tightening torque 64 52 3AZ
.
Replace aluminium screw/bolt.
RA Replacing compressor for air-conditioning system (N52)
BMW AG - TIS
16.02.2013 03:43
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -