bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

4 RA Replacing Compressor For Air-conditioning System (N52)|Page 2246 > < 4 RA Replacing Compressor For Air-conditioning System (N52)
Page 2
background image

Necessary preliminary tasks:

Drawing off, evacuating and filling the A/C system are not

included in the time value given for this work operation

Remove A/C compressor drive belt

Remove front underbody protection 

If necessary, remove coolant thermostat 

Release screws (1) and remove refrigerant lines.

Installation:

Replace all sealing rings and moisten with refrigerant oil.

Tightening torque 64 52 1AZ

.

Release screws (2).

Carefully press coolant thermostat (3) to one side.

Tightening torque 11 53 1AZ

.

Disconnect plug connection (1).

Release screw (1).

Installation:

Tightening torque 64 52 3AZ

.

Replace aluminium screw/bolt.

RA  Replacing compressor for air-conditioning system (N52)

BMW AG - TIS

16.02.2013  03:43

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 2 -

4 RA Replacing Compressor For Air-conditioning System (N52)|Page 2246 > < 4 RA Replacing Compressor For Air-conditioning System (N52)