bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

1 RA Replacing All Connecting Rod Bearings (N52)|Page 354 > < 1 RA Removing And Installing Or Replacing Vibration Damper (N52)
Page 1
background image

11 24 571

Replacing all connecting rod bearings (N52)

Special tools required:

00 2 590

00 9 120

Important!

All crank pins are connected with the crankshaft.

Modified procedure; the bearing shell colours are the same at
the top and bottom.

Blue / Red bearing shell colours are no longer used in
combination.

Necessary preliminary tasks:

Remove all pistons. 

Important!

Note grinding stages on crankshaft.

Reworking (5) as per table (lift bearing).

B = construction stage 1 (- 0.25 mm)

C = construction stage 2 (- 0.50 mm)

RA  Replacing all connecting rod bearings (N52)

BMW AG - TIS

16.02.2013  22:00

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

1 RA Replacing All Connecting Rod Bearings (N52)|Page 354 > < 1 RA Removing And Installing Or Replacing Vibration Damper (N52)