bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

4 RA Replacing Timing Chain (N52) > < 3 RA Removing And Installing _ Replacing Exhaust Camshaft (N52)|Page 382
Page 5
background image

Mount special tools 11 4 461  with screw (1) to inside of cylinder
head.

On cylinder 2 mount special tool  11 4 461  with screw (1)
facing outwards.

Position special tools  11 4 461  so that screw connections (2)
of bearing bank are easily accessible.

Tighten lower and upper bearing banks with special tool 
00 9 120 .

Tightening torque: 11 31 1AZ

.

Important!

Remove special tool 11 4 461  only when camshaft screw
connection is completed.

Assemble engine.

RA  Removing and installing / replacing exhaust camshaft (N52)

BMW AG - TIS

16.02.2013  22:05

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 5 -

4 RA Replacing Timing Chain (N52) > < 3 RA Removing And Installing _ Replacing Exhaust Camshaft (N52)|Page 382