bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

5 RA Venting Cooling System And Checking For Leaks (N52)|Page 620 > < 5 RA Venting Cooling System And Checking For Leaks (N52)|Page 618
Page 3
background image

Close cap on expansion tank.

Important!

Observe the following special venting procedure after 
replacing the engine or heating cooler.

Venting cooling system:

Open cap (1) on coolant expansion tank.

Open vent screw (2).

Important!

Fill coolant expansion tank up to lower edge of filler neck with
recommended coolant.

Pour in coolant slowly.

Close vent screw (2) when bubble-free coolant emerges

1. 

Connect battery charger.

2. 

Switch on ignition.Engine must not be started!

3. 

Connect DIS Tester.

4. 

Cover expansion tank opening with a suitable fluff-free cloth.

This prevents the engine compartment from being fouled by
coolant splashes and contaminants from entering the cooling
system.

5. 

Activate electric coolant pump at 95 % by means of DIS

Tester.

DME brief test

Control unit functions

Component activation

Coolant pump 95 %

The coolant pump is activated by the DIS Tester and
switches off automatically.

6. 

Pour coolant into expansion tank up to max. cold fill level.

7. 

Repeat steps 4 to 6 until the coolant level in the expansion

tank when compared with the last replenishment level (max.
cold fill level) no longer drops when the electric coolant pump
is activated.

8. 

Close cap on expansion tank.

RA  Venting cooling system and checking for leaks (N52)

BMW AG - TIS

16.02.2013  23:21

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 3 -

5 RA Venting Cooling System And Checking For Leaks (N52)|Page 620 > < 5 RA Venting Cooling System And Checking For Leaks (N52)|Page 618