Z Series E85 Z4 3.0Si (N52) ROADST
Installation:
-
Remove and clean release bearing and release lever
-
Push on grease scraper ring 21 2 221 as far as it will
go.
-
Grease splines (1) of input shaft with a brush. refer to
BMW Service Operating Fluids
-
Detach grease scraper ring.
Subsequent work on transmission:
Secure transmission (1) with special tool 23 0 170 or
24 0 200 on assembly stand 00 1 450 .
RA Removing and installing transmission (GS6-37BZ) N52
BMW AG - TIS
16.02.2013 23:47
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 5 -