buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Deployment Procedures|Page 7755 > < Deployment Procedures|Page 7753
Page 4
background image

27. Secure and insulate the connection using electrical tape.

28. Twist together, bend, and tape the remaining connector wire lead to the remaining deployment wire.

29. Connect the deployment harness to the side impact module - LF connector (4).

30. Route the deployment harness out of the driver side of the vehicle.

31. Disconnect the inflatable restraint I/P module connector.

32. Cut the I/P module connector out of the vehicle, leaving at least 16 cm (6 in) of wire at the connector.
33. Strip 13 mm (0.5 in) of insulation from each of the connector wire leads.

Deployment Procedures|Page 7755 > < Deployment Procedures|Page 7753