buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Upper Intake Manifold|Page 4468 > < Upper Intake Manifold|Page 4466
Page 5
background image

5. Loosely install the right (rear) upper intake manifold bolts and studs.
6. Install the upper intake manifold bolts and studs.

^

Tighten the upper intake manifold bolts and studs to 25 Nm (18 ft. lbs.). 

Notice:  Refer to Fastener Notice in Service Precautions.

7. Install the Exhaust Gas Recirculation (EGR) valve.
8. Install the generator bracket.
9. Install the generator brace.

10. Connect the vacuum hose connections to the upper intake manifold.

^

Vacuum booster hose

^

Automatic transaxle vacuum modulator hose

^

Heater and air conditioning vacuum source hose

^

Fuel pressure regulator

Upper Intake Manifold|Page 4468 > < Upper Intake Manifold|Page 4466