buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Radiator Cooling Fan Motor Relay|Locations > < 99-08-64-016C|Page 1934
Page 4
background image

REAR DOOR SCALP MOLDING WITH AUXILIARY WINDNOISE CLOSEOUT SEAL

SERVICE INSTALLATION INSTRUCTIONS

1.

Apply soap solution to cover complete perimeter of outer edge of stationary door frame.

2 and 3.

Position rear door window frame scalp molding assembly to
rear door and starting at upper front corner, engage over outer edges of top leg and upper front vertical leg of door frame simultaneously.
(Figure 4) Once corner on frame, push scalp molding as far forward as possible on horizontal leg of header.

4 - 10.

Engage molding over the outer edge of the stationary door frame
and snap molding onto retainer clips on the inner edge of stationary door frame (Figure 2) working in the order depicted in Figure 5.

Clean area of ALL excess soap. This would be general information for both doors.

IMPORTANT:

Cross section of correctly installed molding (Figure 2).

PARTS INFORMATION:

Parts are currently available from GMSPO.

The following parts are supplied in kit form for 1985-89 model years.

Buick 25557068 - Chrome 4HA69

Buick 25557069 - Chrome 4CX69

IMPORTANT:

For current model application, the individual moldings are serviced separately and are currently available.

WARRANTY INFORMATION:

For 1985-89 model year:
Operation:

Installation of 1990 style scalp moldings (all 4 doors) Operation No. T5194 (requires zone/branch authorization)

Labor Time:

.9 hr.

For 1990 model year:
Use appropriate labor operation and time for scalp molding being replaced.

Radiator Cooling Fan Motor Relay|Locations > < 99-08-64-016C|Page 1934