buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Service Reminder Indicators > < Instrument Panel Electrical Center or Junction Block Replacement|Page 2994
Page 4
background image

9.  Install the positive battery cable lead to the stud on the underhood accessory wiring junction block, then install the cable lead retaining nut.

Tighten the positive battery cable lead to underhood accessory wiring junction block retaining nut to 10 N.m (89 lb in).

10.  Install the remote positive battery cable stud cover.
11.  Connect the negative battery cable. refer to Battery Negative Cable Disconnection and Connection (L26) Battery Negative Cable Disconnection

and Connection (LY7) in Starting and Charging.

Service Reminder Indicators > < Instrument Panel Electrical Center or Junction Block Replacement|Page 2994