LaCrosse V6-3.8L (2009)
3. Connect the electrical connector to the blower control module.
4. Install the right side I/P insulator. Refer to Instrument Panel Insulator Panel Replacement - Right Side (See: Body and Frame/Interior Moulding /
Trim/Dashboard / Instrument Panel/Service and Repair).
5. Refer to Control Module References (See: Testing and Inspection/Programming and Relearning) for programming and setup information.