buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Negative, Battery Cable|Service and Repair|Page 12995 > < Negative, Battery Cable|Service and Repair|Page 12993
Page 6
background image

12. Position the ground wire (5) and install the ground wire bolt (1) to the top rail.

Tighten the nut to 10 N.m (89 lb in).

13. Install the battery cable harness retaining clips (2, 3, and 4) to the front rail and fan shroud.

14. Install the positive battery cable terminal (2) to the BEC.
15. Install the positive battery cable junction block lead nut (1).

Tighten the nut to 10 N.m (89 lb in).

16. Install the BEC cover.

Negative, Battery Cable|Service and Repair|Page 12995 > < Negative, Battery Cable|Service and Repair|Page 12993