buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Brake Pressure Modulator Valve Primary Pipe Replacement|Page 4301 > < Brake Pressure Modulator Valve Primary Pipe Replacement|Page 4299
Page 4
background image

15. Place the flat face of an unused die (1) against the die halves in the clamping cage and hold firmly against the counterbored face of the dies.
16. Insert the prepared end of the pipe to be flared through the back of the dies until the pipe is seated against the flat surface of the unused die (1).
17. Remove the unused die (1).
18. Ensure that the rear of both dies are seated firmly against the enclosed end of the die cage.
19. Firmly hand tighten the clamping screw (2) against the dies.

20. Select the appropriate forming mandrel and place into the forming ram.
21. Rotate the hydraulic fluid control valve clockwise to the closed position.
22. Rotate the body of the CH-45405 - Pipe Flaring Tool Kit until it bottoms against the die cage.

Brake Pressure Modulator Valve Primary Pipe Replacement|Page 4301 > < Brake Pressure Modulator Valve Primary Pipe Replacement|Page 4299