buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Circuit Operation|Page 87 > < General Information|Page 83
Page 1
background image

Accessory Delay Module: Initial Inspection and Diagnostic Overview
Circuit Operation

Retained Accessory Power (RAP) allows the radio, power windows and sunroof to be operated for approximately 10 minutes after turning the ignition
switch to "OFF."

Battery voltage is applied at all times from RH I/P Power Distribution Center Fuse 2 to the Remote Function Actuator (RFA) Module, and from Engine
Compartment MaxiFuse(R) Block RH "IGN1." When the ignition switch is turned to "ACCY" or "RUN," voltage is applied from I/P Fuse Block
WPR/WSHR Fuse 8E to the Remote Function Actuator (RFA) Module "IGNITION 2" input.

When the ignition switch is turned to "OFF," the RFA module senses this and energizes the RAP Relay by grounding RAP Relay terminal F86. With the
RAP relay energized, battery voltage from Engine Compartment MaxiFuse(R) Block RH "IGN1" is applied to power the radio. The radio operates for
approximately 10 minutes or until any door is opened. If any door is opened, the RFA module deenergizes the RAP Relay by removing the ground
source from RAP Relay terminal F86, thus discontinuing power to the radio. The 10 minute time interval can be reset by turning the ignition switch to
"RUN," then back to "OFF."

Circuit Operation|Page 87 > < General Information|Page 83