Lucerne V6-3.8L VIN 2 (2006)
13. Install the positive battery cable terminal (2) to the junction block stud.
14. Install the positive battery cable nut (1) to the junction block stud.
Tighten the nut to 15 N.m (11 lb ft).
15. Install the positive battery cable retainer (1) to the floor pan stud.