Park Avenue V6-3.8L SC VIN 1 (2005)
1. Position the accessory drive belt (1) to the pulleys.
2. Rotate the tensioner (2) counterclockwise to install the drive belt (1).
3. Position the supercharger drive belt (1) to the pulleys.
4. Rotate the tensioner (2) counterclockwise to install the drive belt (1).
5. Install the battery.