Park Avenue V6-3.8L VIN K (1995)
3. Allow 45 seconds minimum for air mix valve actuator to move output crank to its full hot position. Move temperature valve to its full hot position
and snap valve link into retainer on temperature valve.
3. Allow 45 seconds minimum for air mix valve actuator to move output crank to its full hot position. Move temperature valve to its full hot position
and snap valve link into retainer on temperature valve.