Rainier 2WD L6-4.2L VIN S (2005)
4. Install the left front brake pipe.
Tighten the brake pipe fitting to 25 Nm (18 inch lbs.).
5. Install the EBCM to the vehicle.
6. Lower the vehicle.
7. Bleed the brake system.
4. Install the left front brake pipe.
Tighten the brake pipe fitting to 25 Nm (18 inch lbs.).
5. Install the EBCM to the vehicle.
6. Lower the vehicle.
7. Bleed the brake system.