buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Procedures|Page 18322 > < Procedures|Page 18320
Page 5
background image

6. Cut the seat belt pretensioner harness connector out of the vehicle, leaving at least 16 cm (6 in) of wire at the connector.
7. Strip 13 mm (0.5 in) of insulation from each of the connector wire leads.

8. Cut two 6.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. These wires will be used for the seat belt

pretensioner deployment harness.

9. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.

10. Twist together one end from each of the wires in order to short the wires. Deployment wires shall remain shorted, and not connected to a power

source until you are ready to deploy the seat belt pretensioner.

11. Twist together one connector wire lead to one deployment wire.
12. Inspect that the previous connections is secure.

13. Bend flat the twisted connection.
14. Secure and insulate the connection using electrical tape.

15. Twist together, bend, and tape the remaining connector wire lead to the remaining deployment wire.

Procedures|Page 18322 > < Procedures|Page 18320