buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

NVG 120-NR9 - Transfer Case|Page 14627 > < NVG 120-NR9 - Transfer Case|Page 14625
Page 3
background image

2. Align the front output shaft seal on the J 45236-2 (1).
3. Using the J 45236-1 (2), install the front output shaft seal.
4. Remove the J 45236-1 and the J 45236-2.

5. Install the dust shield on the front output shaft.
6. Install the front propeller shaft. Refer to Front Propeller Shaft Replacement.
7. Inspect the transfer case fluid level. Refer to Transfer Case Fluid Replacement (TrailBlazer, Envoy, Rainier, Bravada).
8. Install the fuel tank shield, if equipped. Refer to Fuel Tank Shield Replacement (TrailBlazer EXT, Envoy XL) Fuel Tank Shield Replacement

(TrailBlazer, Envoy).

9. Lower the vehicle. Refer to Lifting and Jacking the Vehicle.

Transfer Case Output Shaft Seal Replacement - Rear

Transfer Case Output Shaft Seal Replacement - Rear

Tools Required

^

J 37668-A

^

J 45380

Removal Procedure 

1. Raise the vehicle. Refer to Lifting and Jacking the Vehicle.

NVG 120-NR9 - Transfer Case|Page 14627 > < NVG 120-NR9 - Transfer Case|Page 14625