Rainier AWD L6-4.2L VIN S (2005)
6. Apply a smooth and continuous bead of urethane (2) 10 mm (0.39 in) wide (B), and 14 mm (0.55 in) high (A) to the underside of the roof module.
Ensure the urethane bead is touching the up-standing rib (1) along the inboard side of the lower rails.
7. With the aid of an assistant, carefully install the moveable roof panel frame to the body. Be sure to align the locating pins (1) to the correct holes in
the body before lowering the moveable roof panel frame onto the body flange (2).
8. Install the bolts retaining the moveable roof frame to the body.
Tighten the moveable roof frame bolts to 5.0 N.m (44 lb in).