buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Deployment Procedures|Page 8761 > < Deployment Procedures|Page 8759
Page 2
background image

6. Clear a space on the ground about 1.85 M (6 ft) in diameter for deployment of the pretensioner. If possible, use a paved, outdoor location free of

activity. Otherwise, use a space free of activity on the shop floor. Make sure you have sufficient ventilation.

7. Make sure no loose or flammable objects are in the area.
8. Place J 39401-B in the center of the cleared area.
9. Fill the fixture plastic reservoir with water or sand.

10. Mount the module (1) in the SIR deployment fixture (3) with the open end facing up using the following mounting method.

-

Adjust and secure the arms (4) of J 39401-B to the deployment fixture (3).

-

To mount, use the proper size bolt (2) and nut (5) with washers in order to secure the pretensioner (1) to the deployment fixture brackets (4).

-

Securely tighten all fasteners prior to deployment.

Deployment Procedures|Page 8761 > < Deployment Procedures|Page 8759