buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Port Fuel Injection|Page 546 > < Port Fuel Injection
Page 2
background image

Fig. 009 - Chart C-1A - Park/Neutral Switch

1.

Checks for switch closing in the P/N position. This is indicated by low voltage on CKT 434.

2.

Checks to see that voltage increases in D/R range.

3.

Checks for faulty wiring to ECM or faulty ECM itself. If voltage is present, it means wiring and ECM are OK.

Port Fuel Injection|Page 546 > < Port Fuel Injection