buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Front Door Weatherstrip > < Door Striker Replacement - Front Door|Page 14105
Page 2
background image

Important:  By installing the 15A fuse, the low current logic power will be restored to both the LH and RH PSDMs and the PSDs will be
operational. However, both PSDMs will have to learn the full open and full closed positions of the PSD. Refer toAcutator Control Module
- Power Sliding Door (PSD) Programming and Setup  
  .

3. If equipped with a power sliding door, enable the PSD system by installing the PSD 15A fuse into the I/P fuse block.

Front Door Weatherstrip > < Door Striker Replacement - Front Door|Page 14105