buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Bracket, Reinforcement, Side Trim Panel Replacement - Front Floor Console|Page 14481 > < Bracket, Reinforcement, Side Trim Panel Replacement - Front Floor Console|Page 14479
Page 4
background image

The rear compartment lid release lock cylinder uses four of the ten cut positions 7-10. A retainer tumbler is used in the rear compartment lid release
lock cylinder to retain the lock cylinder in the latch assembly. This retainer tumbler is not moved by the key. The retainer tumbler occupies the slot
closest to the head of the rear compartment lid release lock cylinder and should come already installed in the cylinder.

1. Hold the cylinder (3) so that the side with four tumbler spring wells is facing up.
2. Insert tumbler springs (2) into the four spring wells.
3. Install the tumbler (1) for key cut position 7 into the slot nearest to the front of the lock cylinder.
4. Install the three remaining tumblers, key cut positions 8, 9 and 10, into the cylinder.
5. Snap the tumblers into place with light hand pressure.
6. Inspect for the correct loading of the tumblers (1) by inserting the key into cylinder (3). All of the tumblers should be flush with the lock cylinder.

ASSEMBLING AND CODING I/P STORAGE COMPARTMENT LOCK CYLINDER

The I/P storage compartment lock only uses four of the ten cut positions 7-10. A retainer tumbler is used in the I/P storage compartment lock to retain
the lock cylinder in the latch assembly. This retainer tumbler is not moved by the key. The retainer tumbler occupies the slot closest to the head of the
I/P storage compartment lock cylinder and should come already installed in the cylinder.

1. Hold the cylinder (3) so that the side with four tumbler spring wells is facing up.
2. Insert tumbler springs (2) into the four spring wells.
3. Install the tumbler (1) for key cut position 7 into the slot nearest to the front of the lock cylinder.
4. Install the three remaining tumblers, key cut positions 8, 9 and 10, into the cylinder.
5. Snap the tumblers into place with light hand pressure.
6. Inspect for the correct loading of the tumblers (1) by inserting the key into cylinder (3). All of the tumblers should be flush with the lock cylinder.

Bracket, Reinforcement, Side Trim Panel Replacement - Front Floor Console|Page 14481 > < Bracket, Reinforcement, Side Trim Panel Replacement - Front Floor Console|Page 14479