buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Deployment Outside Vehicle - Steering Wheel Module, I/P Module, And Side Impact Module|Page 12320 > < Deployment Outside Vehicle - Steering Wheel Module, I/P Module, And Side Impact Module|Page 12318
Page 4
background image

23. Cut the 2 side impact module wires leading to the yellow harness connector, leaving at least 16 cm (6 in) of wire at the connector.
24. Strip 13 mm (0.5 in) of insulation from each of the side impact module connector wire leads.

25. Cut two 6.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. Use these wires to fabricate the deployment

harness.

26. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.
27. Twist together one end from each of the wires in order to short the wires. Deployment wires shall remain shorted, and not connected to a power

source until you are ready to deploy the side impact module.

28. Twist together one connector wire lead to one deployment wire.
29. Inspect that the previous connection is secure.

30. Bend flat the twisted connection.
31. Secure and insulate the connection using electrical tape.

Deployment Outside Vehicle - Steering Wheel Module, I/P Module, And Side Impact Module|Page 12320 > < Deployment Outside Vehicle - Steering Wheel Module, I/P Module, And Side Impact Module|Page 12318