Terraza FWD V6-3.5L VIN L (2006)
1. Install the sliding door catch with reinforcement channel to the sliding door lower track.
Notice: Refer to Fastener Notice.
2. Install the sliding door catch (1) with reinforcement channel and bolt to the sliding door lower track (3).
Tighten the reinforcement channel bolt to 12 N.m (106 lb in).
3. Completely open the sliding door in order to ensure that the sliding door catch holds the sliding door in the open position.
Important: By installing the 15A fuse, the low current logic power will be restored to both the LH and RH PSDMs and the PSDs will be
operational. However, both PSDMs will have to learn the full open and full closed positions of the PSD. Refer to Acutator Control
Module - Power Sliding Door (PSD) Programming and Setup.
4. If equipped with a power sliding door, enable the PSD system by installing the PSD 15A fuse into the I/P fuse block.
5. Close the sliding door.