Allante V8-273 4.5L (1991)
4.
Two bolts from canister retaining ring.
5.
Cannister.
INSTALL OR CONNECT
1.
Cannister in bracket. Make sure canister is positioned as shown in figure, view A.
2.
Retainer ring with two bolts.
3.
Hoses to top of cannister.
4.
Purge solenoid electrical connector.
5.
Air inlet duct.