cadillac Workshop Repair Guides

Cadillac Workshop Service and Repair Manuals

Deployment Inside Vehicle (Vehicle Scrapping Procedure)|Page 19694 > < Deployment Inside Vehicle (Vehicle Scrapping Procedure)|Page 19692
Page 11
background image

81. Route the deployment harness out of the passenger side of the vehicle.

82. Disconnect the right/passenger roof rail air bag yellow harness connector (3) from the vehicle harness connector (2).

83. Cut the harness connector out of the vehicle, leaving at least 16 cm (6 in) of wire at the connector.
84. Strip 13 mm (0.5 in) of insulation from each of the connector wire leads.

85. Cut two 6.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. These wires will be used to fabricate the roof rail 

air bag deployment harness.

86. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.
87. Twist together one end from each of the wires in order to short the wires.

88. Twist together one connector wire lead to one deployment wire.

Deployment Inside Vehicle (Vehicle Scrapping Procedure)|Page 19694 > < Deployment Inside Vehicle (Vehicle Scrapping Procedure)|Page 19692