CTS V6-2.8L (2006)
3. Install a NEW snap ring in the groove.
4. Apply 5 - 6 grams (0.18 - 0.21 ounce) of grease from the kit in the snap ring area, ensuring that the surface of the bearing is covered.
5. Install a NEW slinger from kit with the J25863 until it seats on the shaft against the bearing.