CTS V6-3.2L VIN N (2003)
17. Separate the 2 banana plugs on the SIR deployment harness.
CAUTION: When you are deploying a pretensioner for disposal, perform the deployment procedures in the order listed. Failure to follow
the procedures in the order listed may result in personal injury.
18. Place a 12 V minimum/2 A minimum power source (i.e., vehicle battery) near the shorted end of the harness.
IMPORTANT: When the seat belt pretensioner deploys, the deployment fixture may jump about 30 cm (1 ft) vertically. This is a normal reaction of
the seat belt pretensioner due to the force of the rapid expansion of gas inside the pretensioner.
19. Connect the SIR deployment harness wires to the power source. Pretensioner deployment will occur when contact is made.
20. Disconnect the SIR deployment harness from the power source after the pretensioner deploys.
21. Seat one banana plug into the other in order to short the deployment harness leads.