CTS V6-3.2L VIN N (2003)
8. Install the NEW O-ring on the end of the spline shaft.
9. Apply 1 - 2 grams of grease to the splines for assembly.
10. Install the NEW dust boot clamp over the splines.
11. Align the paint marks on the shaft to ensure proper assembly balance. Push the splines together.
12. Push the dust boot and clamp over the shaft.