CTS V8-5.7L VIN P (2004)
31. Secure and insulate the 3 wire connection to deployment harness using electrical tape.
32. Twist together two connector wire leads (the low circuits from side air bag and pretensioner) to one sets of deployment wires. Refer to SIR
Connector End Views in order to determine the correct circuits.
33. Inspect that the 3 wire connection is secure.
34. Bend flat the twisted connection.