CTS RWD V8-6.2L SC (2009)
4. Install the muffler insulator (1) to the muffler hanger rod (3).
5. Install the muffler insulator (1) to the rear suspension hanger rod (2).
6. Inspect for underbody clearance and tail pipe alignment.
4. Install the muffler insulator (1) to the muffler hanger rod (3).
5. Install the muffler insulator (1) to the rear suspension hanger rod (2).
6. Inspect for underbody clearance and tail pipe alignment.