Service Procedure
Service Procedure
Using the Global Warranty Management System, determine the build date of the vehicle.
-
If the vehicle was built between 3/2/09 through 1/17/10, refer to First Design Magnesium Beam Service Repair.
-
If the vehicle was built between 1/18/10 through 5/12/10, refer to Second Design Magnesium Beam Service Repair.
First Design Magnesium Beam Service Repair
Passenger Side Lower Magnesium Beam Cut Procedure
1. Remove the instrument panel insulator. Refer to Instrument Panel Insulator Replacement - Right Side (Left Hand Drive) in SI.
2. Remove instrument panel compartment from the vehicle. Refer to Instrument Panel Compartment Replacement (Left Hand Side) in SI. Destroy the
instrument panel compartment assembly (door and storage bin) and retain for the required 15 days after claim payment.
3. Remove the instrument panel side trim panel assembly. Refer to Instrument Panel Side Trim Panel Assembly Replacement in SI.