DeVille V8-4.6L VIN Y (1998)
3. Slide the mast assemblies (3,4) over the 100 rod section (2) and down into the mast stationary tube (9) past the contractor fingers.
4. Remove the assembly tool.
5. Install the bottom mast (4) into the stationary tube (9).
Ensure that the threaded top of the 100 rod section (2) is above the top of the other tubes
6. Install the insulator stop (5).
7. Install the finial (1).
8. Reconnect the power source.
9. Cycle the antenna mast.