DeVille V8-4.6L VIN Y (1998)
Description
29. Route the deployment harness out of the passenger side of the vehicle.
Description
30. Cut the two side impact inflator wires leading to the yellow 2-way harness connector, leaving at least 16 cm (6 in) of wire at the connector.
31. Strip 13 mm (0.5 in) of insulation from each of the side impact inflator connector wire leads.
32. Cut two 6.1 M (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. These wires will be used to fabricate the side
impact inflator deployment harness.
33. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.
34. Twist together one end from each of the wires in order to short the wires.
Description
35. Twist together one connector wire lead to one deployment wire.