DeVille V8-4.9L VIN B (1995)
INSTALL
1.
Cannister in bracket. Make sure canister is positioned as shown in figure, view A.
2.
Two bolts.
3.
Hoses to top of cannister.
4.
Purge solenoid electrical connector.
5.
Relay Center bracket.
INSTALL
1.
Cannister in bracket. Make sure canister is positioned as shown in figure, view A.
2.
Two bolts.
3.
Hoses to top of cannister.
4.
Purge solenoid electrical connector.
5.
Relay Center bracket.