DeVille DHS V8-4.6L VIN Y (2000)
62. Cut two 6.1 M (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. Use these wires to fabricate the deployment
harness.
63. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.
64. Twist together one end from each of the wires in order to short the wires. Deployment wires shall remain shorted, and not connected to a power
source until you are ready to deploy the side air bag module and pretensioner.
65. Twist together two connector wire leads (1 side air bag and 1 pretensioner) to one to the deployment harness wires.
66. Inspect that the 3 wire connection is secure.