cadillac Workshop Repair Guides

Cadillac Workshop Service and Repair Manuals

Deployment Procedures|Page 11180 > < Deployment Procedures|Page 11178
Page 12
background image

^

Place the J 39401-B (2) in the center of the cleared area.

^

Fill the deployment fixture (2) with water or sand.

^

Mount the IP module (1) in the deployment fixture (2) with the vinyl/plastic trim facing up.

^

To mount, use 4 M 6 bolts (6), nuts (8), and washers (7) to properly secure the IP module (1) to the deployment fixture (2).

^

Tighten all fasteners prior to deployment.

10. When deploying a side impact module, refer to the following instructions:

^

Place the J 39401-B SIR deployment fixture (3) in the center of the cleared area.

^

Fill the deployment fixture (3) with water or sand.

^

Mount the side impact module (1) in the deployment fixture (3) with the vinyl/plastic trim facing up.

^

Adjust and secure the J 39401-B arms (4) to the deployment fixture (3).

^

To mount, use 2 M 6 x 1.0 nuts (2) with washers to secure the side impact module (1) to the deployment fixture arms (4).

^

Tighten all fasteners prior to deployment.

11. Inspect the J 38826 SIR deployment harness and the appropriate pigtail adapter for damage. Replace as needed.
12. Short the 2 SIR deployment harness (1) leads together using one banana plug seated into the other.
13. Connect the appropriate pigtail adapter (2) to the SIR deployment harness (1).

Deployment Procedures|Page 11180 > < Deployment Procedures|Page 11178