Fleetwood Brougham V8-307 5.0L (1989)
Figure 6
Center Pillar:
1. Seal the center pillar to drip rail with silicon sealer. Refer to Figure 6.
For warranty purposes use Labor Operation T6573 at 1.2 hours.
Figure 6
Center Pillar:
1. Seal the center pillar to drip rail with silicon sealer. Refer to Figure 6.
For warranty purposes use Labor Operation T6573 at 1.2 hours.