cadillac Workshop Repair Guides

Cadillac Workshop Service and Repair Manuals

Transmission Mount, A/T > < 02-07-30-052G|Page 3710
Page 4
background image

29.

Reconnect plumbing. Fill can half full with water, secure the fill cap, and pressurize the can to 550-700 kPa (80-100 psi).

30.

Aim tool into the five gallon pail or floor drain and depress the trigger to allow water from the can to flow through the tool orifice for 30 seconds
to insure proper cleaning.

31.

Bleed air pressure from can, remove the fill cap, and empty the can.

32.

Reconnect fill cap and hose to the flushing tool.

Time allowance for the cooler flushing procedure will be included in specific, 1986 and 1987 Labor Time Guide operations. When using 1986 and prior
Time Guides, add 0.6 hours for cooler flushing to the recondition or SRTA replacement time allowance.

Cadillac bulletins are intended for use by professional technicians, NOT a "do-it-yourselfer". They are written to inform these technicians of conditions
that may occur on some vehicles, or to provide information that could assist in the proper service of a vehicle. Properly trained technicians have the
equipment, tools, safety instructions, and know-how to do a job properly and safely. If a condition is described, DO NOT assume that the bulletin applies
to your vehicle, or that your vehicle will have that condition. See your Cadillac dealer for information on whether your vehicle may benefit from the
information.

Transmission Mount, A/T > < 02-07-30-052G|Page 3710