Seville V8-273 45L (1989) Dashboard and Instrument Panel Component Repair | Page 5918
Install or Connect
-
With the help of another technician, install instrument panel assembly.
1. Six screws securing instrument panel.
2. Instrument panel reinforcement brace.
3. Instrument panel compartment electrical connectors.
-
Push glove box fuse panel into place in dash panel.
4. Glove box unit and secure with four screws.
5. Dash-to-instrument panel interconnect.
6. Front console assembly. Refer to "Front Console Assembly".
7. I/P cluster. Refer to "Instrument Panel Cluster".
8. CCDIC and secure with three screws.
9. Steering column. Refer to SUPPLEMENTAL INFLATABLE RESTRAINT STEERING WHEEL AND COLUMN.
10. I/P steering column reinforcement plate and secure with four screws.
11. Knee bolster and secure with five screws.
12. Center trim plate and secure with two screws.
13. Right-side sound insulator and secure with two nuts.
14. Courtesy lamp to sound insulator and three screws securing right-side sound insulator.
15. Center sound insulator and secure with three screws.
16. Battery negative (-) cable.
-
Enable the SIR system. Refer to 'Enabling the SIR System".