Seville STS V8-4.6L VIN 9 (1998)
26. Secure and insulate the connection using electrical tape.
27. Twist together, bend, and tape the remaining connector wire lead to the remaining deployment wire.
28. Connect the deployment harness to the inflatable restraint IP module yellow 2-way connector.
29. Route the deployment harness out of the passenger side of the vehicle.
30. Disconnect the driver side air bag/pretensioner yellow 6-way connector (2) located under the driver seat (1).
31. Cut the two pretensioner wires (terminals A and F) leading to the yellow 6-way harness connector, leaving at least 16 cm (6 in) of wire at the
connector.