cadillac Workshop Repair Guides

Cadillac Workshop Service and Repair Manuals

Deployment Procedures|Page 11135 > < Deployment Procedures|Page 11133
Page 19
background image

89. Bend flat the twisted connection.
90. Secure and insulate the connection using electrical tape.

91. Twist together, bend, and tape the remaining connector wire lead to the remaining deployment wire.
92. Connect the deployment harness to the roof rail module yellow connector.

93. Route the deployment harness out of the passenger side of the vehicle.

94. Completely cover the windshield and front door window openings with a drop cloth.
95. Stretch out all of the deployment harness wires on the right side of the vehicle to their full length.
96. Deploy each deployment loop one at a time.
97. Place a power source, 12 V minimum/2 A minimum (i.e., a vehicle battery) near the shorted end of the harnesses.
98. Separate the one set of wires and touch the wires ends to the power source in order to deploy the inflator modules, doing one module at a time.
99. Disconnect the deployment harness from the power source and twist the wire ends together.

100. Continue the same process with the remaining deployment harnesses that are available.

Deployment Procedures|Page 11135 > < Deployment Procedures|Page 11133