cadillac Workshop Repair Guides

Cadillac Workshop Service and Repair Manuals

Deployment Inside Vehicle (Vehicle Scrapping Procedure)|Page 18746 > < Deployment Inside Vehicle (Vehicle Scrapping Procedure)|Page 18744
Page 12
background image

85. Cut two 6.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. These wires will be used to fabricate the roof rail 

air bag deployment harness.

86. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.
87. Twist together one end from each of the wires in order to short the wires.

88. Twist together one connector wire lead to one deployment wire.

89. Bend flat the twisted connection.
90. Secure and insulate the connection using electrical tape.

91. Twist together, bend, and tape the remaining connector wire lead to the remaining deployment wire.
92. Connect the deployment harness to the roof rail module yellow connector.

93. Route the deployment harness out of the passenger side of the vehicle.

Deployment Inside Vehicle (Vehicle Scrapping Procedure)|Page 18746 > < Deployment Inside Vehicle (Vehicle Scrapping Procedure)|Page 18744