STS RWD V8-4.6L VIN A (2006)
10. If you have a side impact module, refer to the following instructions:
-
Place the J 39401-B (3) in the center of the cleared area.
-
Fill the deployment fixture with water or sand.
-
Using the proper nuts and mount the side impact module (1) to the deployment fixture (3), with the vinyl trim facing up.
-
Adjust and secure the fixture arms (4) to the deployment fixture (3).
-
Securely tighten all fasteners that hold the side impact module (1) to the deployment fixture (3).
11. If you have a roof rail module, refer to the following instructions:
-
Place the J 39401-B (3) in the center of the cleared area.
-
Fill the deployment fixture with water or sand.
-
Using the proper nuts (2) and mount the roof rail module (1) to the deployment fixture (3), with the vinyl face up.
-
Adjust and secure the fixture arms (4) to the deployment fixture (3).
-
Securely tighten all fasteners that hold the roof rail module (1) to the deployment fixture (3).
12. Inspect the J 38826 and the appropriate pigtail adapter for damage. Replace as needed.
13. Short the 2 SIR deployment harness leads (1) together using one banana plug seated into the other.
14. Connect the appropriate pigtail adapter (2) to the SIR deployment harness (1).
IMPORTANT: Refer to Tools Required list for the correct adapter.
15. Extend the SIR deployment harness and adapter to full length from the deployment fixture.