cadillac Workshop Repair Guides

Cadillac Workshop Service and Repair Manuals

Deployment Inside Vehicle (Vehicle Scrapping Procedure)|Page 18769 > < Deployment Inside Vehicle (Vehicle Scrapping Procedure)|Page 18767
Page 15
background image

10. If you have a side impact module, refer to the following instructions:

-

Place the J 39401-B (3) in the center of the cleared area.

-

Fill the deployment fixture with water or sand.

-

Using the proper nuts and mount the side impact module (1) to the deployment fixture (3), with the vinyl trim facing up.

-

Adjust and secure the fixture arms (4) to the deployment fixture (3).

-

Securely tighten all fasteners that hold the side impact module (1) to the deployment fixture (3).

11. If you have a roof rail module, refer to the following instructions:

-

Place the J 39401-B (3) in the center of the cleared area.

-

Fill the deployment fixture with water or sand.

-

Using the proper nuts (2) and mount the roof rail module (1) to the deployment fixture (3), with the vinyl face up.

-

Adjust and secure the fixture arms (4) to the deployment fixture (3).

-

Securely tighten all fasteners that hold the roof rail module (1) to the deployment fixture (3).

12. Inspect the J 38826 and the appropriate pigtail adapter for damage. Replace as needed.
13. Short the 2 SIR deployment harness leads (1) together using one banana plug seated into the other.
14. Connect the appropriate pigtail adapter (2) to the SIR deployment harness (1).

IMPORTANT:  Refer to Tools Required list for the correct adapter.

15. Extend the SIR deployment harness and adapter to full length from the deployment fixture.

Deployment Inside Vehicle (Vehicle Scrapping Procedure)|Page 18769 > < Deployment Inside Vehicle (Vehicle Scrapping Procedure)|Page 18767