cadillac Workshop Repair Guides

Cadillac Workshop Service and Repair Manuals

1-2 Shift Solenoid Replacement|Page 12989 > < 1-2 Shift Solenoid Replacement
Page 2
background image

1. Install new O-ring seals (4-5) to the 1-2 shift solenoid (7), if the O-rings were previously removed.
2. Install the 1-2 shift solenoid (7) into the control valve body.

3. Install the 1-2 shift solenoid retainer into the control valve body.

4. Connect the electrical wiring harness connector (2) to the 1-2 shift solenoid (1).
5. Install the transmission fluid pan. 

1-2 Shift Solenoid Replacement|Page 12989 > < 1-2 Shift Solenoid Replacement