chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Diagram Information and Instructions|Page 30 > < Diagram Information and Instructions|Page 28
Page 18
background image

3. Prepare the splice. Untwist the conductors and follow the splicing instructions for copper wire. Staggering the splices by 65 mm is recommended.

IMPORTANT:  Apply the mylar tape with the aluminum side inward. This ensures good electrical contact with the drain wire.

4. Re-assemble the cable.

^

Rewrap the conductors with the mylar tape.

^

Use caution not to wrap the drain wire in the tape (1).

^

Follow the splicing instructions for copper wire and splice the drain wire.

^

Wrap the drain wire around the conductors and tape with mylar tape.

Diagram Information and Instructions|Page 30 > < Diagram Information and Instructions|Page 28