Avalanche 2500 2WD V8-8.1L VIN G (2002)
4. Install the park/turn retainer pins.
5. Rotate and lock the pins in place.
6. Inspect the operation.
4. Install the park/turn retainer pins.
5. Rotate and lock the pins in place.
6. Inspect the operation.