Avalanche 2500 4WD V8-8.1L VIN G (2003)
INSTALLATION PROCEDURE
1. Install the new bulb to the park/turn assembly by twisting the bulb clockwise in order to lock in place.
2. Connect the electrical connector to the bulb.
3. Install the park/turn assembly.
4. Install the park/turn retainer pins.
5. Rotate and lock the pins in place.
6. Inspect the operation.